One of the most important standards scored in a Joint Commission evaluation is room pressurization (EC.02.05.01). According to ASHRAE Standard 170 (used specifically by TJC as its standard), over 60 different areas of concern within a facility need to be either positively or negatively pressured. Pressurization in these spaces is tested simply by holding a tissue at the bottom of a door and determining whether the tissue is blown back away or sucked towards the gap.
Positive Pressure
Rooms that are positively pressured are designed to control airborne contaminants by forcing them outside of the space in question – keeping the “bad stuff” out. Theses spaces include:
Negative Pressure
Rooms that are positively pressured are designed to control airborne contaminants by forcing them inside of the space in question – keeping the “bad stuff” in. Theses spaces include:
Being able to effectively display differential pressure in these spaces is imperative during TJC inspections, but more importantly it’s critical for patient and employee safety. As regulatory drivers continue to improve patient safety, the technology within health care facilities across the country needs to keep up. Pressure sensing solutions that are accurate and reliable have never been more valuable.
By future-proofing your facility and staying ahead of regulatory bodies like The Joint Commission, you have the opportunity to save valuable time and money better spent on improving patient health.