Every year 30% of electricity in commercial buildings is wasted, let Setra help you find where your energy is going and how to manage it.
Configure
Utilize the built-in configuration portal to easily map out what’s being measured to support any energy management strategy
Connect
Wire the voltage service lines, current transformers, pule I/O and communications wiring to the meter
Collect
Leverage the available BACnet or Modbus communications protocol to tie the meter into any existing or new EMS or BAS within the application
Setra Power Meter is used in many different facilities to help monitor energy use, save on energy costs, aid with tenant billing, identify equipment malfunctions, and so much more. Click on the buttons below to discover the many applications using Setra's Power Meter.
1
Identify what's going to be metered
Look across the installation and identify the equipment that are to be measured to support energy strategy
Examples: Chillers, Lighting, AHU’s, Tenant Usage
2
Count up how many CT’s are needed
Match the CT amperage to the breaker feeding the load or use Patrol Flex Coils (up to 1500A)
Single-Phase Service = 1CT
Split-Phase Service = 2 CT’s
Three Phase Service= 3 CT’s
3
Select Meter Part Number
Take the CT count and select the meter with the right number by matching the CT’s with available inputs
SPM03EDN = 3 CT inputs
SPM12EDN = 12 CT inputs
SPM48EDN = 48 CT inputs
Service & Calibration | Products | Service/RMA | Supplier | Customer | Contact Us | FAQs | About | Careers | Request Quote | Blog | Fortive Supplier Diversity
159 Swanson Road Boxborough, MA 01719 | orders@setra.com
+1 (978) 263-1400
Copyright © 2022 Setra Systems. All Rights Reserved. | Terms & Conditions | Privacy Notice | ISO 9001:2015 Certified | Prop 65 | Cookies